毛片在线观看视频_小黄漫画激情四射在线观看_少妇喷潮aV久久久16色_人妻健身房yin乱_又大又粗黄色片_免费人妻av无码专区五月_男人天堂狠狠干_色综合香蕉網_国产综合精品777_99国产免费观看

GX-ZLZR18H Modern Refrigeration and Air Conditioning System Skills Training Equipment
  • GX-ZLZR18H Modern Refrigeration and Air Conditioning System Skills Training Equipment

GX-ZLZR18H Modern Refrigeration and Air Conditioning System Skills Training Equipment

一、Product Overview

This device is a practical training device specifically designed for refrigeration related majors in vocational colleges. Based on the characteristics of air conditioning and refrigerator maintenance technology in the refrigeration industry, it is designed for the electrical control of air conditioning and refrigerators, as well as the installation and maintenance of refrigeration systems. It strengthens students' comprehensive professional abilities in the installation, electrical wiring, working condition debugging, fault diagnosis and maintenance of air conditioning and refrigerator system pipelines. The device integrates fluid mechanics, thermodynamics, heat transfer, electrical control and other technologies, and is suitable for teaching and training of refrigeration related majors.

二、Technical Parameter

1)Input power supply: single-phase three wire 220V ± 10% 50Hz;

2)Working environment: temperature -10 ℃~40 ℃, relative humidity ≤ 85% (25 ℃), altitude < 4000m;

3)Device capacity: ≤ 1.5kVA;

4)External size: 150cm × 80cm × 140cm;

Safety protection: Equipped with leakage voltage and current protection, safety meets national standards。

三、Practical training projects

1. Air conditioning system pipeline design, assembly, wiring, and debugging project

1)Pipeline design task

Design of air conditioning system pipelines (including determination of pipeline distance, cutting, bending, expanding, expanding, welding, etc.).

2)System assembly task

Install the designed pipeline in a reasonable position of the corresponding components and complete pressure maintenance and leak detection of the air conditioning system.

3)System wiring tasks

Determine the winding of the air conditioning compressor and complete the wiring and connection of the air conditioning system.

4)System debugging tasks

Complete the vacuum pumping, refrigerant filling, electrical debugging, and working condition adjustment of the air conditioning system.

2. Refrigerator system pipeline design, assembly, wiring, and debugging project

1)Pipeline design task

The design of the refrigerator system pipeline (including the determination of pipeline distance, pipe cutting, bending, expansion, expansion, etc.).

2)System assembly task

Install the designed pipeline in a reasonable position of the corresponding components and complete pressure maintenance and leak detection of the refrigerator system.

3)System wiring tasks

Determine the winding of the refrigerator compressor, complete the wiring and connection of the refrigerator system

4)System debugging tasks

Complete the vacuum pumping, refrigerant filling, electrical debugging, and working condition adjustment of the refrigerator system.


Company address: No.2, West Pingbu Avenue, Huadu District, Guangzhou, Guangdong Province
Email: 80625188@qq.com
18602035841? ??61847208 ?
Manager Wang
Product brochure
Follow us
National Service Hotline:
本站使用百度智能門戶搭建 管理登錄
粵ICP備2021147056號